This website uses cookies

Read our Privacy policy and Terms of use for more information.

THE MANIFOLD PRO · DEEP DIVE 03

In 1990, NASA launched the Hubble Space Telescope after years of extraordinary engineering effort. Its primary mirror was 2.4 meters in diameter and had been polished with remarkable precision. The telescope was supposed to capture images of distant galaxies with a clarity that would have been impossible from Earth, free from the distortions caused by our atmosphere.

But when Hubble began returning images, astronomers discovered that the telescope couldn't bring light into proper focus. Its most important optical component, manufactured under demanding technical specifications and subjected to extensive testing, had a defect that threatened much of the mission's scientific potential. The mirror was the wrong shape.

NASA's investigation eventually traced the problem to a measuring instrument used during fabrication. A lens within that instrument had been positioned incorrectly by approximately 1.3 millimeters, causing engineers to polish the mirror to the wrong curvature. Other optical tests had indicated something was wrong, but those conflicting results were discounted while the primary measuring system continued to guide the work.

The mirror was manufactured with extraordinary care, but the team had placed too much confidence in a measurement that was incorrect. NASA eventually corrected Hubble's vision by installing additional optics during a servicing mission in 1993, and the telescope went on to become one of the most productive scientific instruments ever built.

But the original failure illustrates something I've been thinking about for a while. You can put enormous effort into a project, follow sophisticated procedures, employ talented people, and produce something that meets your internal standards, only to discover that you've still missed the mark.

Although the consequences are rarely as spectacular as launching a defective telescope into orbit, I think a similar problem appears throughout ordinary professional life. We tend to judge work by the effort involved, the credentials of the people doing it, the complexity of the process, or how convincingly the result is presented. Those things can be positive indicators of quality, but they definitely can’t guarantee it.

Paul Graham explored some of these ideas in his essay How to Do Great Work, particularly the importance of curiosity, choosing interesting problems, and following them further than most people would. His essay is largely concerned with exceptional achievement, but I've been thinking about a related question that applies just as much to an engineer, manager, designer, or someone trying to build something useful on the side.

What actually separates good work from everything else we spend our days doing? And perhaps more importantly, how do we get better at producing it?

logo

Subscribe to The Manifold Pro to read the rest.

Become a paying subscriber of The Manifold Pro to get access to this post and other subscriber-only content.

Upgrade

Already a subscriber? Sign in

A subscription gets you:

  • Two deeply researched long-form articles every month
  • Engineering, emerging technology, science, and original ideas
  • Full access to the growing Deep Dive archive